Posts

Pure Water Oceanside Gets $69 Million Loan

Oceanside has been awarded a $69 million loan to help finance the innovative Pure Water project that broke ground with a ceremony at the San Luis Rey Valley site in February.

The Water Infrastructure Finance and Innovation loan from the federal Environmental Protection Agency will cover nearly half of the project’s $158 million costs, city officials said. The 1.2 percent interest rate is expected to save an estimated $24 million over typical market financing costs.

Oceanside’s Plan to Recycle Water Gets a Boost From the EPA

Oceanside’s major water reclamation project is getting a financial injection from the Environmental Protection Agency.

The EPA is loaning Oceanside nearly $70 million to help finance the city’s water reuse plans. The San Diego County city currently imports most of its water from the Sacramento Bay-Delta and the Colorado River.

The federal loan for the $158 million project will ultimately help Oceanside generate three to five million gallons of drinking water a day.

The Water Authority is Resurrecting its Pipe Dream – Again

After almost 80 years of suckling the proverbial teat that brings fresh water from the Colorado River and Sierra Nevadas to San Diego, the local water manager is hatching a plan to unlatch.

CA Natural Resources Secretary Wade Crowfoot on the Governor’s Water Resilience Portfolio

Water is central to nearly everything we value in California. Healthy communities, economies, farms, ecosystems and cultural traditions depend on steady supplies of safe water. Those values are increasingly at risk as California confronts more extreme droughts and floods, rising temperatures, overdrafted groundwater basins, aging infrastructure and other challenges magnified by climate change.

Poseidon’s Desalination Plan for Huntington Beach Delayed Again

After years of bureaucratic hurdles and increasing regulatory requirements, Poseidon Water was dealt yet another delay Friday, Aug. 7, in its pursuit of a controversial desalination plant in Huntington Beach.  The Regional Water Quality Control Board concluded three days of hearings on the project’s next permit by telling Poseidon it must return with a more robust, more detailed mitigation plan to offset the environmental damage the project will cause.

Water Officials Push Back Decision on Huntington Beach Desal Project Yet Again

State regional water officials have again delayed a decision on a controversial seawater desalination plant in Huntington Beach, instead placing further requirements on the project’s company to reckon with the facility’s anticipated environmental damage.

Opinion: The LA Sequel to Owens Valley: The Tunnel to destroy Northern SJ Valley

It wasn’t my finest moment.

I was hiking the Owens River Gorge in mid-July. Usually that would be as smart as planting your hands on a stove burner turned to high.

Severe thunderstorms in the eastern Sierra above Bishop prompted a last minute change in plans. And given that the temperature in the Owens Valley that day was predicted to be 20 degrees cooler than the previous day’s high it was the perfect opportunity to take a hike in an area where the heat makes it a seriously insane proposition between June and September.

Before Los Angeles got is claws into Owens Valley to divert snowmelt and draw down the high desert water tables to essentially bleed Eastern California and stunt its economic growth all so the City of Angels could prosper beyond the means of its water basin, the gorge carried water tapped into by farmers and ranchers working the land.

2020 Water Resilience Portfolio Released by Governor Newsom

Governor Gavin Newsom recently released the final version of the 2020 Water Resilience Portfolio to help guide California water policy moving forward. The initial draft proposal of the portfolio was announced back in January and now includes 14 new actions after receiving input from more than 200 individuals and organizations during the comment period. The water blueprint outlines 142 policy priorities for state agencies to emphasize.

‘Project Labor’ Deal to Help Revive San Diego’s Stalled $5B Pure Water Project

San Diego officials have agreed to the first “project labor agreement” in city history to help resolve legal challenges that have stalled Pure Water, a $5 billion sewage recycling system that would produce one-third of the city’s water.

Poseidon Desalination Proposal for Huntington Beach May Face New Requirements

Poseidon Water could be headed back to the drawing board to better compensate for the marine life expected to be killed by its proposed desalination plant in Huntington Beach.

After hearings this week for one of two remaining major permits needed for the project, several members of the Regional Water Quality Control Board indicated they were dissatisfied with the proposed mitigation for the larvae and other small marine life that would die as a result of the plant’s ocean intake pipes.