Tag Archive for: Water Infrastructure

T.E. Roberts to replace Pipelines for RMWD

The Aug. 25 Rainbow Municipal Water District board meeting included the award of two pipeline replacement contracts to T.E. Roberts.

The company based in Orange was given a $280,399 contract for the Sagewood Road pipeline and a $301,734 contract for the Nella Lane pipeline. The two contracts were awarded on separate 4-0 votes with Helene Brazier abstaining from both.

Pure Water Oceanside Recycling Project Gets $69 Million EPA Loan

The Pure Water Oceanside project is getting a $69 million loan from the U.S. EPA that will finance nearly half of the project’s construction cost.

EPA officials announced the loan at an event today in Oceanside attended by federal, regional and local officials.

The innovative water reuse project will purify recycled water to create a new source of high-quality drinking water that is clean, safe, drought-proof and sustainable. It also will benefit the environment by reducing discharges into the Pacific Ocean. Construction and operation of the plant is expected to create 622 jobs.

Scheduled to be completed by the end of 2022, Pure Water Oceanside will be the first operating advanced water purification facility in San Diego County. The project will provide more than 32% of the City of Oceanside’s water supply, or 3 to 5 million gallons per day.

Suez to Improve Rainbow Tank Staircases

Suez Water Technologies and Solutions will install additional tank fall protection improvements at Rainbow Municipal Water District reservoirs.

Rainbow’s board voted 4-1, with Helene Brazier casting the dissenting vote, Aug. 25, to approve a change order to the 2018 contract.

“This adds some additional safety enhancements for our steel reservoirs,” Tom Kennedy, general manager of Rainbow, said.

Oceanside’s Plan to Recycle Water Gets a Boost From the EPA

Oceanside’s major water reclamation project is getting a financial injection from the Environmental Protection Agency.

The EPA is loaning Oceanside nearly $70 million to help finance the city’s water reuse plans. The San Diego County city currently imports most of its water from the Sacramento Bay-Delta and the Colorado River.

The federal loan for the $158 million project will ultimately help Oceanside generate three to five million gallons of drinking water a day.

Oceanside Gets $69 Million Loan for Critically Important Recycled Water Project

Oceanside received a $69 million federal loan Thursday that will pay for almost half of the city’s ambitious drinking water recycling project.

The Pure Water Oceanside project will provide 32% of the city’s water by 2022. It will be the first operating advanced water purification facility in San Diego County, beating San Diego’s considerably larger recycling project.
Pure Water Oceanside-US EPA loan-Water Recycling

Pure Water Oceanside Recycling Project Gets $69 Million EPA Loan

The Pure Water Oceanside project is getting a $69 million loan from the U.S. EPA that will finance nearly half of the project’s construction cost.

EPA officials announced the loan at an event today in Oceanside attended by federal, regional and local officials.

The innovative water reuse project will purify recycled water to create a new source of high-quality drinking water that is clean, safe, drought-proof and sustainable. It also will benefit the environment by reducing discharges into the Pacific Ocean. Construction and operation of the plant is expected to create 622 jobs.

Scheduled to be completed in 2022, Pure Water Oceanside will be the first operating advanced water purification facility in San Diego County. The project will provide more than 32% of the City of Oceanside’s water supply, or 3 to 5 million gallons per day.

Sustainability, drought-proof water supply

“The City of Oceanside is proud to be a leader in sustainability and water reliability,” said Oceanside Mayor Peter Weiss. “Pure Water Oceanside marks the next big step for our City as the project will safeguard against drought, reduce our dependence on imported water, and create an exceptionally pure drinking water supply.”

“I appreciate the U.S. EPA in their funding support as it is a critical aspect for Oceanside’s ability to continue to improve our local water supplies while minimizing our impact to our ratepayers,” said Weiss.

Loan supports infrastructure investments

“At the City of Oceanside, we are focused not only on today, but also are committed to planning for tomorrow to ensure future generations will have access to high-quality drinking water,” said Oceanside Water Utilities Director Cari Dale. “This loan will be instrumental in moving our Pure Water Oceanside project forward to completion and aligns with our long-term goal to have 50% of our city’s water supply be locally sourced by 2030.”

The Water Infrastructure Finance and Innovation Act (WIFIA) loan to help finance the Pure Water Oceanside Project comes at a critical time, as the federal government, EPA, and water industry work to offset the public health and financial impacts of COVID-19.

The Pure Water Oceanside project is estimated to cost $158 million, and the WIFIA loan will finance nearly half of that cost, according to the EPA. The remaining project funds will come from a combination of grants, water system revenue backed obligations, and system funds.

“EPA’s support for this project illustrates two agency priorities as we work to meet 21st century water demands — reusing the water that we have and revamping our nation’s water infrastructure,” said EPA Assistant Administrator for Water David Ross. “With WIFIA’s support, Pure Water Oceanside will be a landmark project as EPA looks to foster additional innovative water reuse strategies and infrastructure investments across the country.”

Pure Water Oceanside-EPA Loan-Water Recycling

“I am proud and excited for the City of Oceanside and everyone who has worked so hard on the Pure Water Oceanside project,” said Congressman Mike Levin, who represents north San Diego County. “Now more than ever, it’s critically important that we diversify our water supply. Thanks to Pure Water Oceanside, the City of Oceanside, and this EPA loan, we are one step closer to achieving that independence. This is an extraordinary milestone and will make a huge difference for countless families in North County.”

National Water Reuse Action Plan

The water reuse benefits of the project highlight commitments made under the National Water Reuse Action Plan—a collaborative effort and the first initiative of its magnitude aimed at strengthening the sustainability, security and resilience of our nation’s water resources. The Action Plan frames the business case that water reuse is a viable and growing means of supporting our economy and improving the availability of freshwater for farmers, industry, communities, and ecosystems.

“By improving water infrastructure, we are improving the quality of life and public health in our communities,” said EPA Pacific Southwest Regional Administrator John Busterud. “Through the WIFIA loan program, EPA is happy to support the Pure Water Oceanside Project in ensuring access to clean and safe drinking water for decades to come.”

CZU Complex Fire Damages Crucial Water Supply Pipes

The CZU Lightning Complex Fire that stretches from San Mateo County to Santa Cruz County devastated neighborhoods, roads and crucial water supply pipes.

Hundreds of families have been told not to drink the water, even if they boil it.

There’s a lot of cleaning up to do, especially at the water district facilities, and some of that cleanup includes removing damaged trees that stand 100-200 feet high.

Recycled water-Olivenhain Municipal Water District-APWA-collaboration

Olivenhain Municipal Water District Recycled Water Expansion Project is Project of the Year

Olivenhain Municipal Water District’s Recycled Water Pipeline Extension 153A was recognized September 10 as a 2020 Project of the Year by the San Diego and Imperial County Chapter of the American Public Works Association at its virtual awards event.

The pipeline extension connected the Surf Cup Sports youth soccer fields in San Diego to OMWD’s recycled water distribution system. By allowing Surf Cup to convert the irrigation of 55 acres of grass fields to recycled water, OMWD has reduced potable water demands for irrigation by up to 100 million gallons per year.

“OMWD’s board is honored to receive this award for a collaborative project, which expanded the use of recycled water while protecting the environment,” said OMWD Board Treasurer Larry Watt. “Additionally, state grant funding helped pay for the project, reducing costs for our ratepayers.”

Project of the Year will save up to 100 million gallons of potable water annually

The project involved the installation of 1,600 feet of 8-inch PVC pipeline that required specialized drilling and interagency cooperation to be completed. The pipeline needed to cross the San Dieguito River, causing design, permitting, and construction obstacles. OMWD’s design team used horizontal directional drilling to install the pipeline more than sixty feet below the river bottom.

Horizontal directional drilling reduces not only surface area damage, but also environmental impacts from construction site dust, making it less impactful to nearby habitat and communities than traditional excavation work.

Interagency cooperation benefits wildlife

OMWD worked with the California Department of Fish and Wildlife on a streambed alteration agreement to ensure the protection of fish and wildlife habitat. OMWD also worked with the U.S. Fish and Wildlife Service to protect nesting birds such as the federally listed clapper rail and barn owl.

By OMWD taking proactive steps, such as daily biological sweeps of the project and inspections of the trenchless process, there was no adverse impact to habitat or species in the project area.

City of San Diego, Santa Fe Irrigation District collaboration with OMWD

Interagency cooperation was also required for the project. The property is served water by Santa Fe Irrigation District and owned by the City of San Diego. While SFID did not have nearby recycled water infrastructure, it wanted to provide Surf Cup fields with a drought-resilient water supply. The OMWD pipeline project meets that need.  The San Diego City Council approved a permanent utility easement allowing crews to access the property.

Grant funds support regional water management efforts

California’s Department of Water Resources awarded $202,300 for the project in Proposition 84 funding, which is administered by water wholesaler San Diego County Water Authority through the Integrated Regional Water Management program. The San Diego IRWM Program supports collaborative water management to increase regional self-reliance throughout California.

APWA is a professional association of public works agencies, private companies, and individuals dedicated to promoting public awareness through education, advocacy, and the exchange of knowledge. The APWA San Diego and Imperial County chapter annually recognizes the best public works projects and professionals in San Diego and Imperial Counties. The Project of the Year award is also intended to highlight the collaboration and cooperation between public and private agencies, contractors, and consultants, to complete public works projects.

‘We’ve Always Known Ours Was Contaminated’: the Trouble With America’s Water

Ageing infrastructure, legacy pollution and emerging contaminants across the US are driving a growing urgency to do something about America’s water crisis.

Fallbrook Rattlesnake Tank Artwork Honors High School Seniors

Each year, the Fallbrook Public Utility District’s water storage tank uphill from South Mission Road is painted with new numbers. There’s a story about local Fallbrook history behind the fresh design on the “Rattlesnake Tank.” The District changes the painted numbers on the tank to reflect the year incoming seniors at Fallbrook High School will graduate.