Pipeline 5 at Moosa Creek Shut Down for Repair Work

The repair work for one of the San Diego County Water Authority pipelines in Moosa Canyon will be done this month, and two shutdowns of the SDCWA pipeline will sandwich the carbon fiber relining.

“We shut down Pipeline 5, and we are currently in the process of installing two internal steel bulkheads,” Neena Kuzmich, engineering manager with CWA, said. “We just started a shutdown Monday.”

That Monday was March 30.

“It’s a seven-day shutdown of Pipeline 5, and that’s to facilitate the carbon fiber repair,” Kuzmich said.