Posts

Fallbrook Public Utility District logo

Big Event Marks FPUD Turning 100 Years Old

Fallbrook, Calif. – Fallbrook Public Utility District has been providing water and sewer service in Fallbrook for nearly 100 years. Now thanks to a unanimous vote by the San Diego Local Agency Formation Commission, or LAFCO, the process is moving forward for the district to be able to provide additional community services under the umbrella of parks and recreation services, streets, and street lighting.

The Fallbrook Public Utility District turns 100 years old on June 5.

The district is celebrating its anniversary with a huge, open-to-the-public event June 4, from 11 a.m. to 3 p.m., to mark a century of supplying water to more than 35,000 residents in Fallbrook.

LAFCO Begins Public Review of Draft MSR Updates for FPUD, RMWD, NCFPD, CSA No. 81

San Diego County’s Local Agency Formation Commission has released the draft municipal service review updates of Fallbrook special districts for public review. Discussion on updating the municipal service review information for the Fallbrook Public Utility District, the Rainbow Municipal Water District, the North County Fire Protection District, and County Service Area No. 81 was part of the Dec. 6 LAFCO board meeting although releasing the report for public review did not require a vote.

FPUD to Lease Indirect Potable Reuse Pilot Treatment Equipment from Intuitech

A pilot test will be conducted on the Fallbrook Public Utility District’s planned indirect potable reuse project, and Intuitech will be leasing the pilot treatment equipment to FPUD.

FPUD’s board voted 5-0 Oct. 25 to authorize a $370,450 agreement with Intuitech for the lease of the equipment. The pilot project will determine the best treatment process as well as the feasibility of utilizing reclaimed water to augment groundwater in the Lower Santa Margarita River basin.

Free, Drought-Tolerant Plants Available to FPUD Customers

The Fallbrook Public Utility District is now accepting applications for customers to receive free, drought-tolerant succulents. Approved applicants will receive the plants, free of charge, to transform their landscape and save water.

Fallbrook PUD recently completed the annual painting of Rattlesnake Tank to salute the Class of 2022. Photo: Fallbrook PUD

Class of 2022 Cheers New FPUD Rattlesnake Tank Artwork

Although the Fallbrook Public Utility District water storage tank uphill from South Mission Road has received a fresh set of painted numbers annually for 35 years, this week’s update was the most anticipated makeover ever.

FPUD crews change the painted numbers on the tank to reflect the year incoming seniors will graduate at Fallbrook High School. A three-person team made up of district employees Matt Lian, Colter Shannon, and Toby Stoneburner recently painted over the “21,” changing it to “22” to welcome the graduating class of 2022.

It took the team five hours to paint the 25-foot-tall numbers onto the 3.6 million-gallon tank, compressed through the magic of time-lapse video to under 30 seconds.

“Parents and Fallbrook High seniors anxiously await the painting of the tank and begin calling the office early in June to find out when we’re doing it,” said Noelle Denke, FPUD public affairs officer. “This year, it’s especially exciting for them because they’re going back to campus and need something to look forward to.”

The reason for the annual external makeover dates back 35 years. Before the district started painting the tank, Fallbrook High seniors took on a longstanding dare. They would climb up the hill in the middle of the night, scale the tank and then paint it themselves.

Since it’s a long way down, FPUD staff became concerned for student safety. Workers installed a fence at the time to prevent access by the annual stealth painting crew.

But it didn’t deter the energetic students. Instead, they just began jumping the fence in the middle of the night. So district officials struck a deal with the students. If they would stop risking their safety for the dare, FPUD would safely paint the tank every year to commemorate them.

A 25-foot salute to Fallbrook High’s graduating seniors   

The annual painting for the Class of 2022 began due to safety concerns. Photo: Fallbrook PUD

The annual painting for the Class of 2022 began due to safety concerns. Photo: Fallbrook PUD

“We’ve been doing it ever since,” said Denke.

Since the tank shares the space with several cell towers, Fallbrook Public Utility District makes arrangements to power down their towers. Then crews safely hoist themselves up to the tower and get to work painting.

Rattlesnake Tank was built in the early 1950s and is one of Fallbrook’s oldest and most visible water tanks.

(Editor’s note: The Fallbrook Public Utility District is one of the San Diego County Water Authority’s 24 member agencies that deliver water across the metropolitan San Diego region.)

FPUD Now Accepting Applications For Summer Internship

Students at Fallbrook High, Oasis High or Ivy High schools can now apply online for a paid summer internship at Fallbrook Public Utility District. This year, FPUD is looking for students interested in a career in social media and customer service. The internship is available to any student enrolled in one of those schools as a junior or senior for the upcoming 2021-2022 school year. Candidates must be 16 years or older on the first day of the internship, July 12. Pay will be $14 per hour, and the intern will work three hours per week, for six weeks. The internship is designed for students looking to help with social media outreach, create posts and videos, assist with outreach and developing ideas, and learn more about the water industry. It will provide a hands-on learning experience to help build skills and knowledge to help guide students to potential career paths.

FPUD Contract for Ross Lake PRV Project Awarded to Genesis

The Fallbrook Public Utility District contract for the Ross Lake pressure reducing valve project was awarded to Genesis Construction.

The Hemet company had the low bid for the FPUD project, and on April 26 the FPUD board voted 5-0 to approve a $51,444 contract with Genesis Construction.

Onyx Paving Given FPUD Contract

While repairing leaks of Fallbrook Public Utility District facilities, FPUD staff temporarily patched 40 sites with cold mix asphalt. On March 22, FPUD’s board awarded Onyx Paving a contract for a one-time paving project to replace the cold mix patches with permanent hot mix paving. The 5-0 vote awarded Onyx Paving the contract for $77,120.

FPUD Approves Programmable Logic Controller Contract for Reclamation Plant

The Fallbrook Public Utility District approved a contract with SCADA Integrations to upgrade the conveyor system at FPUD’s Water Reclamation Plant with a programmable logic controller system.

A 5-0 FPUD board vote Monday, March 22, approved the request for proposals submission from SCADA Integrations. The upgrade will be constructed in two phases, and the contract has a total value of $128,470.

SRK Given FPUD Contract to Replace Gum Tree Pipeline

SRK Engineering received the Fallbrook Public Utility District contract to replace FPUD’s Gum Tree Pipeline.

The FPUD board voted 5-0 Monday, March 22, to award SRK a $428,500 contract, which matches the Escondido company’s bid. The work will replace approximately 1,400 feet of 20-inch diameter cement mortar lined and coated steel pipe along with associated appurtenances.