You are now in Agency News News category.

Receive Up to $75 For Fixing A Leak Now Through The End of June

Chula Vista, Calif. – To assist customers with costs associated with leak repairs and to help conserve our most precious resource – water, Sweetwater Authority (Authority) is offering rebates of up to $75 for repairs from March 1, 2022, through June 30, 2022. The special rebate is in celebration of the national Fix a Leak Week, which serves as an annual reminder to check household plumbing fixtures and irrigation systems for leaks.

In addition to this special rebate on leak repairs, the Authority offers customers a $75 rebate to replace or install a new pressure reducing valve at their home. These valves help to address high pressure that can cause increased wear on fittings, making them more prone to leaks. A rebate of up to $100 is also available for qualifying leak detectors and flow monitors, which can alert customers to potential leaks through an app on their smartphone.

California drought-snowpack survey-DWR-snow survey

California Drought Now in Third Year

California officials have urged residents to prepare for a third year of drought and urged people to conserve water.

“With only one month left in California’s wet season and no major storms in the forecast, Californians should plan for a third year of drought conditions,” said California Department of Water Resources Director Karla Nemeth. “A significantly below-average snowpack combined with already low reservoir levels make it critical that all Californians step up and conserve water every day to help the state meet the challenges of severe drought.”

The DWR conducted the third snow survey of the season March 1 at Phillips Station.

Following a January and February that will enter records as the driest documented in state history, the manual survey recorded 35 inches of snow depth and a snow water equivalent of 16 inches, which is 68% of average for this location for March, according to the DWR. The snow water equivalent measures the amount of water contained in the snowpack and is a key component of DWR’s water supply forecast. Statewide, the snowpack is 63% of average for this date.

Water conservation “a way of life” in San Diego County

“As we enter a third year of drought, we encourage residents and businesses in San Diego County to increase their water conservation efforts,” said Jeff Stephenson, water resources manager with the San Diego County Water Authority. “While the Water Authority and its 24 member agencies have worked to create multiple sources of water supply for the region, there are still opportunities, including rebates, to save more water.”

In San Diego County, the website, watersmartsd.org, provides sources of residential and business rebates, including indoor and outdoor incentives, agricultural programs, and free landscape makeover classes.

Stephenson added that the region has reduced its reliance on imported water supplies, including from the Sacramento-San Joaquin Bay Delta, which means more of that source is available for other parts of California.

Governor Gavin Newsom has asked all Californians to cut back water use at least 15% compared to 2020 levels. Regionally, the Northern, Central, and Southern Sierra snowpacks are all standing just above 59% to 66% of average for this date, impacting watersheds across the state, according to the DWR.

“As the world continues to warm, precipitation is pushing toward extremes,” said Jeremy Hill, Manager of DWR’s Hydrology and Flood Operations Branch. “Even when we see large storms producing a lot of snow early in the season, all it takes is a few dry weeks to put us below average. This new pattern challenges forecasting efforts that have relied on historical patterns, so DWR has led the charge to adopt new technologies and utilize the best available science to manage water in real time and use forecasts that give us time to make decisions to get the most benefits and minimize the hazards.”

California Drought

Dry year-drought-DWR-snow survey-California drought

An extremely dry January and February have wiped out an early season surplus and brought the February snowpack below average. With no storm relief in sight, Californians should prepare for drought conditions to continue, the DWR tweeted March 1. Graphic: California Department of Water Resources

Dry times in the Golden State

Although early season storms helped alleviate some drought impacts, a lack of storms in January and February heightens the need for conservation. The Governor has asked all Californians to cut back water use at least 15 percent compared to 2020 levels. Regionally, the Northern, Central, and Southern Sierra snowpacks are all standing just above 59 percent to 66 percent of average for this date, impacting watersheds across the state.

“With below average precipitation and snowpack up until this point, our latest statewide snowmelt forecasts are only 66 percent of average,” said Sean de Guzman, Manager of DWR’s Snow Surveys and Water Supply Forecasting Unit. “That is not enough to fill up our reservoirs. Without any significant storms on the horizon, it’s safe to say we’ll end this year dry and extend this drought a third year.”

P4 Repair-Bonsall-pipeline-Asset Management

Proactive Pipeline Repair Maintains Water Supply Reliability, Affordability

The San Diego County Water Authority is proactively fixing a 90-inch diameter pipeline in Bonsall. The work is part of the agency’s long-term commitment to maintaining regional investments in water supply reliability and affordability.

Water Authority staff detected potential pipeline weaknesses just north of West Lilac Road in late January using real-time acoustic fiber-optic monitoring. This technology locates distressed sections of pipelines even while they are in use as part of the Water Authority’s high-tech asset management program.

Further investigation prompted the Water Authority to prioritize repairs on a 48-foot-long section of pipeline. Water Authority staff are carefully monitoring the pipe section around the clock while preparing designs and identifying contractors that can quickly mobilize for repairs.

Water supply affordability

Plans are to shut down and drain that stretch of pipe starting March 1. Work to replace the pipeline segments will continue until the line is back in service approximately 10 days later.

“This repair highlights the value of strategic investments in money-saving asset management tools and training,” said Martin Coghill, a senior manager for operations and maintenance at the Water Authority. “By proactively identifying this problem spot, we prevented what could have been a major unplanned shutdown.”

Pipeline 4-Bonsall-Asset Management-pipelines

The San Diego County Water Authority is proactively fixing a 90-inch diameter pipeline in Bonsall as part of the agency’s long-term commitment to maintaining regional investments in water supply reliability and affordability. Graphic: San Diego County Water Authority

Coordination, collaboration with member agencies

The Water Authority has been coordinating closely with retail water agencies in North County that rely on deliveries from Pipeline 4. Rainbow Municipal Water District, Fallbrook Public Utility District, City of Oceanside, Valley Center Municipal Water District, and Vallecitos Water District are preparing to continue water deliveries by other means to homes and businesses while Pipeline 4 is out of service.

Fortunately, while Pipeline 4 is shut down the Water Authority’s resilient system can deliver treated water to retail agency connections from multiple sources, including the Carlsbad Desalination Plant.

P4 Repair-desalination-asset management-Bonsall

Fortunately, while Pipeline 4 is shut down the Water Authority’s resilient system can deliver treated water to retail agency connections from multiple sources, including the Carlsbad Desalination Plant. Photo: San Diego County Water Authority

Water Authority infrastructure repairs are funded by water ratepayers countywide. Regional investments in supply reliability ensure consistent and timely monitoring, maintenance, and repairs of the complex countywide water delivery system. Those investments, in turn, support San Diego’s regional economy and quality of life.

The Water Authority operates and maintains a water delivery system capable of delivering more than 900 million gallons of water per day through 310 miles of large-diameter pipeline, 1,600 aqueduct-related structures, and approximately 100 metering/flow control facilities. It also includes a state-of-the-art water treatment plant, hydroelectric facilities, pump stations, flow regulatory structures, and reservoirs that store water for emergencies and dry years.

Proactive asset management saves ratepayers money

As assets age, the Water Authority proactively replaces and repairs them to minimize impacts to member agencies and the public. Investments in the latest inspection technologies, including electromagnetic scanning, robotic inspections and 3D tunnel inspections help the Water Authority’s asset management team detect defects in pipelines and related facilities. By identifying corrosion or other types of deficiencies early, potential problems are corrected so they don’t become large and more costly issues.

Approximately 82 miles of the Water Authority’s pipelines are pre-stressed concrete cylinder pipes, also known as PCCP, that are made from a combination of steel and concrete. However, numerous catastrophic failures have occurred with these pipes worldwide in recent decades. In response, the Water Authority instituted a proactive program in 1991 to reinforce the pipelines with steel liners. To date, the Water Authority has relined 47 miles of PCCP.

(Editor’s note: The Rainbow Municipal Water District, Fallbrook Public Utility District, City of Oceanside, Valley Center Municipal Water District, and Vallecitos Water District are five of the San Diego County Water Authority’s 24 member agencies that deliver water across the metropolitan San Diego region.)

North County Water Delivery System Repairs Start March 1 in Bonsall

The San Diego County Water Authority is proactively fixing a 90-inch diameter pipeline in Bonsall as part of the agency’s long-term commitment to maintaining regional investments in water supply reliability and affordability.

Water Authority staff detected potential pipeline weaknesses just north of West Lilac Road in late January using real-time acoustic fiber-optic monitoring. This technology locates distressed sections of pipelines even while they are in use as part of the Water Authority’s high-tech asset management program.

Vista Irrigation District Logo

Vista Irrigation District To Hold Public Hearings On Redistricting

Vista, Calif. – Vista Irrigation District board of directors will hold a public hearing on March 2, 2022 at 9 a.m. to discuss proposed adjustments to division boundaries as part of the decennial redistricting process.

Every ten years, agencies with by-district election systems, such as Vista Irrigation District, must use new federal census data to review and, if needed, redraw electoral division boundaries to reflect how local populations have changed. This process, called redistricting, ensures all electoral divisions comply with both the California and federal Voting Rights Acts. The District must reestablish electoral divisional boundaries, creating divisions that are balanced in population and in accordance with local, state, and federal laws that govern the redistricting process. Redistricting does not change the District’s service area boundaries.

Olivenhain Municipal Water District Logo landscape design workshops

Photographers Recognized in Annual Elfin Forest Recreational Reserve Contest

Encinitas, Calif. — At its February 16 meeting, Olivenhain Municipal Water District’s Board of Directors recognized seven amateur photographers for their winning images in the fifteenth annual Elfin Forest Recreational Reserve photo contest.

The contest offers photographers an opportunity to share images of the natural beauty protected at EFRR through a partnership between OMWD, the US Bureau of Land Management, and San Diego County Water Authority. Contest entries assist in educating the public on local recreational opportunities and support EFRR’s mission to protect wildlife and natural resources.

Eva Plajzer Named Director of O&M for Water Authority

February 7, 2022 – Eva Plajzer, a 30-year civil engineering and management professional, has been appointed Director of Operations and Maintenance for the San Diego County Water Authority. She fills the position vacated by the retirement of Jim Fisher, whose 32-year career included nearly 10 years in a leadership role at the Water Authority.

Sweetwater Authority Receives Funding From State For Water Bill Debt Accrued During COVID-19

Chula Vista, Calif. – Sweetwater Authority (Authority) recently received $633,540 from the COVID-19 relief fund. The money will cover residential and commercial water debt accrued between March 4, 2020 and June 15, 2021. Funds were distributed directly to the Authority and will be applied to delinquent accounts to cover outstanding balances. Unused funds will be returned to the state, as required

Credit Agencies Cite Water Authority Diversification, Reliability for Strong Ratings

February 2, 2022 – The three major U.S. rating agencies reported strong credit ratings and credit quality for the San Diego County Water Authority kicking off 2022. Newly released analysis by Fitch Ratings, S&P Global, and Moody’s allow the Water Authority to optimize its debt portfolio and minimize the cost of financing vital water reliability projects.

System Maintenance-Leak Prevention-Otay Water District customers may see workers inspecting the meter in front of their home or business, typically between 7 a.m. and 5 p.m., Monday through Friday. Some weekend and night work may also be required. Photo: Otay Water District preventative system maintenanceOtay Water District customers may see workers inspecting the meter in front of their home or business, typically between 7 a.m. and 5 p.m., Monday through Friday. Some weekend and night work may also be required. Photo: Otay Water District preventative system maintenance

Otay Water District Invests in Preventive System Maintenance

As part of its preventive maintenance program to safeguard its water supply and reduce water loss, the Otay Water District is conducting leak inspections of its pipeline system. Leak detection and repair programs save water by ensuring water system integrity. The District uses state-of-the-art equipment to inspect its water distribution system for leaks in pipelines, meters, and valves. The equipment is designed to “listen” for leaks and can pinpoint the location of even the smallest water leak. Once identified, crews will schedule the needed repairs.

Otay’s contractor, Utility Services Associates, will inspect approximately 173 miles of potable water mains in Rancho San Diego, El Cajon, and Jamul, along with potable and recycled water mains in areas of Chula Vista. The work is now underway.

Water leaks often account for a substantial portion of lost revenue in water utility systems. If just small single-digit percentages of water carried by the Otay Water District’s pipelines were lost to leaks, it would cost hundreds of thousands of dollars per year and waste a precious resource.

System maintenance: Leak inspections underway at homes and businesses

The District’s contractor, Utility Services Associates, will inspect approximately 173 miles of potable water mains in Rancho San Diego, El Cajon, and Jamul, along with potable and recycled water mains in areas of Chula Vista. Photo: Otay Water District

The District’s contractor, Utility Services Associates, will inspect approximately 173 miles of potable water mains in Rancho San Diego, El Cajon, and Jamul, along with potable and recycled water mains in areas of Chula Vista. Photo: Otay Water District

Otay Water District customers may see workers inspecting the meter in front of their home or business, typically between 7 a.m. and 5 p.m., Monday through Friday. Some weekend and night work may also be required. The duration of the inspection can range from a few minutes to one day.

Workers will be wearing a Utility Services Associates logo and carry company identification. They will not need access to customers’ homes or property but may contact customers if they need to momentarily shut off their water supply for further testing. They will not shut off the water supply without permission from someone at the home or property.

Workers may be lifting water meter covers, inspecting, and attaching equipment to meters or valves. If a leak is suspected, the Otay Water District will contact the customer and advise them of the potential leak.

The inspection has an estimated completion date of Friday, April 29, 2022, subject to weather and other circumstances.

Customers with questions on the Leak Detection Program can contact Otay Water District’s customer service representatives at (619) 670-2222.

(Editor’s note: The Otay Water District is one of the San Diego County Water Authority’s 24 member agencies that deliver water across the metropolitan San Diego region.)