FPUD Amends Design Services Contract for CUP
The Fallbrook Public Utility District’s professional services contract for the Santa Margarita River Conjunctive Use Project has been amended.
The Fallbrook Public Utility District’s professional services contract for the Santa Margarita River Conjunctive Use Project has been amended.
The Coachella Valley Water District broke ground Tuesday on a project that will connect the Westside Elementary School in Thermal to the water system that services much of the valley. Westside is the only school in its district relying solely on a well and has a history of water contamination.
The Bay Area’s hopes for weekend rains to help snuff the Glass Fire and dampen the parched hills seem to be evaporating.
California water regulators on Tuesday cut the level at which water suppliers must report detecting perchlorate, a chemical used in rocket fuel, fireworks, airbags, and other products. The federal Environmental Protection Agency earlier this year declined to regulate perchlorate, which has been linked to thyroid conditions.
Droughts usually evoke visions of cracked earth, withered crops, dried-up rivers and dust storms. But droughts can also form over oceans, and when they then move ashore they are often more intense and longer-lasting than purely land-born dry spells.
Researchers at the University of California San Diego report in a new study a way to improve groundwater monitoring by using a remote sensing technology (known as InSAR), in conjunction with climate and land cover data, to bridge gaps in the understanding of sustainable groundwater in California’s San Joaquin Valley.
Despite little precipitation and a small snowpack in the 2020 water year, which ended Sept. 30, California weathered the year on water stored in reservoirs during previous years’ storms. Going into 2021, farmers note that weather officials predict a La Niña climate pattern in the Pacific Ocean, which has brought drought conditions in the past.
Unforeseen conditions caused a change order to the Fallbrook Public Utility District contract to replace the pipeline along Winter Haven Road, but it was the only change order needed in the contract to replace approximately 2,570 feet of pipeline. The Sept. 28 FPUD board meeting included a 5-0 vote to approve the change order and also to approve the notice of completion for the project.
A report by California energy officials on Tuesday placed blame for rolling blackouts that left millions without power in August on the impact of climate change and outdated policies and practices that failed to adequately take into account hotter weather.
If the state has any hope of heading off a looming “tidal wave” of residential water shut offs and bankrupt water systems it has to get a picture of current impacts, advocates urged.