Posts

Marin Water Utility Set to Begin Studies of New Supply Options

The Marin Municipal Water District is preparing to launch more in-depth studies of new water supply projects, beginning with assembling consulting teams. The district board is set to vote on contracts with new consulting teams next month to begin preliminary technical, environmental and engineering studies of larger, more complex projects. The projects include expanding local reservoir storage, constructing a brackish Petaluma River desalination plant and installing new pipelines to transfer Russian River water directly into local reservoirs.

Drought: Marin Water Utility Weighs New Fees for Excessive Use

The Marin Municipal Water District is considering whether to charge new penalties for high water users during the drought.

The proposal discussed by the district’s board this week would set varying caps on water use during the “summer” and “winter” billing periods. Ratepayers would be charged a fee for every 748 gallons used above that cap.