Restoration efforts are making headway in Santee and Lakeside. This includes the use of hydroseeding - the spraying of a mulch type mixture with seeds and a binding agent in order to prevent erosion and protect the seeds. Photo: East County AWP

East County AWP Updates Construction Progress for 2025

Progress on the East County Advanced Water Purification Program (East County AWP) continues on schedule at multiple East County locations, with an increasing number of milestones being reached as the project nears completion in 2025.

The East County Advanced Water Purification Program is an important water project for East San Diego County. When complete, it will deliver a clean, reliable, and local water source.

See a time-lapse video of 12 months of construction from January through December 2024.

Over the last 12 months, many milestones have been accomplished, including:

  • Completion of the purified water pipelines in Santee
  • Fanita Parkway has been repaved, curbs and sidewalks restored, and construction equipment removed
  • Completed 95% of concrete pouring required for the site
  • Completed 78% of all water pipeline construction
  • Installed the Lake Jennings inlet to allow purified water to flow into the lake before it is treated at the R.M. Levy Water Treatment Plant
The East County AWP achieved significant milestones in 2024.

The East County AWP achieved significant milestones in 2024, with more ahead in 2025.

Construction is set to begin in spring 2025 on a newly approved phase of the project that will include work within Mission Trails Regional Park. This phase includes the rehabilitation of the existing East Mission Gorge Force Main, which will help add capacity for increased sewer flows during rainy weather to the City of San Diego for treatment.

It also includes the construction of new pipelines in the East County to manage residuals, which are the organic residues removed from wastewater during the treatment process, sending them from the East County AWP Project around the City of San Diego’s Pure Water Program facilities as a regional solution to residuals management.

Tour the latest East County AWP construction progress in this video update.

Purified Water Pipeline Construction and Road Closures

Work on pipelines is ongoing in Lakeside at the following areas:

  • Riverside Drive from Riverford Road to Rio Camino
  • Channel Road from the bridge to Rio Camino
  • Channel Road from the bridge to Mapleview Street

Expect reduced travel lanes at these locations. Crews have completed purified water pipeline installation along Mast Boulevard, which is being followed by final roadway paving.

Final paving entails grinding and overlaying the existing roadway to be replaced with new asphalt. Crews use a remote-controlled trench roller to compact the top layer of material when paving the roadway.

Jack and bore excavation work is underway near State Route 67 and Mapleview Street in Lakeside ahead of purified water pipeline installation. Photo: East County AWP

Jack and bore excavation work is underway near State Route 67 and Mapleview Street in Lakeside ahead of purified water pipeline installation. Photo: East County AWP

Restoration Efforts Underway in Santee and Lakeside

As part of restoration efforts, residents may see hydroseeding, the spraying of a mulch-type mixture with seeds, and a binding agent to prevent erosion and protect the seeds.

Newly hydroseeded areas along Fanita Parkway in Santee where pipeline construction is complete. Photo: East County AWP

Newly hydro-seeded areas along Fanita Parkway in Santee, where pipeline construction is complete. Photo: East County AWP

Hydroseeding work is nearly complete along Fanita Parkway in Santee, with final work to be completed this spring. In addition to newly installed plants, El Monte Road in Lakeside was also recently hydro-seeded.

Avoid walking, dog walking, biking, jogging, and driving in hydro-seeded areas. These activities prolong the revegetation efforts and the length of time these areas are closed to the public.

Protecting Bird Species During Construction

Compliance with the Migratory Bird Treaty Act and general protection of wildlife within the project vicinity allows birds like this Bald Eagle to safely nest in the construction area during breeding season. Photo: East County AWP

Compliance with the Migratory Bird Treaty Act and general wildlife protection within the project vicinity allows birds like this Bald Eagle to safely nest in the construction area during breeding season. Photo: East County AWP

The East County AWP project is committed to complying with the Migratory Bird Treaty Act and protecting wildlife within the project areas.

The Migratory Bird Treaty Act protects common, game, and special-status bird species across the United States. This protection includes nests, eggs, and young. With the spring bird breeding season now underway, larger birds such as hawks, owls, and crows build their nests early in the season. Smaller songbirds start nesting in early spring.

If additional vegetation clearing is required, biologists supervise clearance once the absence of nesting is confirmed.

Stay Updated On Program Progress With Interactive Map

When completed, water from this project will be provided to customers in Padre Dam Municipal Water District, Helix Water District, and Lakeside Water District service areas, and the northern portion of the Otay Water District.

With construction in multiple locations throughout East County, the Program’s interactive map continues to be a valuable tool for residents and businesses to track where work is happening. The map is updated regularly and accessible 24/7 through the EastCountyAWP.com website. Information is also available via social media at @eastcountyawp

An overhead view of construction progress on the East County Advanced Water Purification program Education Center. Photo: East County AWP Padre Dam

East County Advanced Water Program Summer Progress Report

Significant work has been completed on the East County Advanced Water Purification Program (East County AWP) since construction began more than two years ago in June 2022. Multiple milestones have been achieved through the first half of 2024, with construction continuing at multiple East County locations through 2025.

The East County Advanced Water Purification Program is an important water project for East San Diego County. When complete, it will deliver a clean, reliable and local water source.

Construction reached a significant milestone in July, completing 58% of the purified water pipeline installation. This 10-mile pipeline will transport purified water from north of Santee Lakes to Lake Jennings.

Elements currently under construction in parts of Santee and Lakeside include:

  • Installing a 10-mile purified water pipeline
  • Constructing wastewater/residual pipelines and pump station upgrades
  • Building water treatment facilities, operations center, laboratory, and public education center

Work underway at Lake Jennings

Lake Jennings is expected to be restored to full capacity later this summer. Photo: East County AWP

Lake Jennings is expected to be restored to full capacity later this summer. Photo: East County AWP

Crews are working to connect the purified water pipeline to Lake Jennings on the north end of the lake in Half Moon Cove. In April 2024, Helix Water District temporarily lowered Lake Jennings by approximately 23 feet to make this work possible. Helix completed its work on the reservoir’s outlet tower and is refilling the lake.

The lake is expected to be restored to full capacity later this summer. Click here for additional lake updates. Minor work nearby will require occasional, short-term closures of the Flume Trail.

Purified water is expected to start flowing into Lake Jennings in 2026. The water will mix with local and imported water, followed by treatment at the R.M. Levy Water Treatment Plant and then distributed to the community.

Treatment facilities taking shape

Roads have reopened at Lakes 3 and 4 at the Santee Lakes Recreational Preserve. Photo: East County AWP East County Advanced Water

Roads have reopened at Lakes 3 and 4 at the Santee Lakes Recreational Preserve. Photo: East County AWP

Construction of the treatment facilities north of Santee Lakes is progressing, with roughly 80% of the concrete (42,000 cubic yards) poured. Once complete, 52,400 cubic yards of concrete will be used—enough to fill 16 Olympic-sized swimming pools.

The advanced water purification, water recycling and solids handling facilities are being built, as well as an operations center to house the operation controls, laboratory, and education center. The public will be invited to visit the interactive lobby and to tour the facilities once the program goes online.

Wastewater and residual pipelines currently under construction run parallel to each other and are each 3.5 miles long. They will connect the water recycling facility north of Santee Lakes to the pump station near the westbound onramp to Route 52.

An example of a trenchless construction method called horizontal directional drilling. Photo: East County AWP

The residuals pipeline has been successfully installed under the Carlton Oaks Golf Course and San Diego River using a trenchless construction method called horizontal directional drilling. This method is used instead of digging a conventional open trench, minimizing environmental impacts.

More than 100,000 pounds of pulling force was required for this operation. The installation of the wastewater pipeline running parallel, using the same method, is anticipated by early 2025.

Water from this project will be provided to customers in Padre Dam Municipal Water District, Helix Water District, Lakeside Water District service areas, and the northern portion of the Otay Water District.

Traffic affected in Santee and Lakeside construction zones

Construction has affected traffic in several areas.

In Santee, wastewater pipeline construction is underway on Fanita Parkway near Lake Canyon Road.  When traveling in the area, expect one-way traffic control with delays of up to five minutes. Flaggers are assisting drivers in navigating around the construction zone.

Elsewhere, purified water pipeline construction continues from Park Center Drive, heading west toward Fanita Parkway in Santee. Road paving is complete between Magnolia Avenue and Park Center Drive, and between Cambury Drive and Halberns Boulevard. All of this work has resulted in traffic control with lane closures.

Drivers should plan additional traveling time on Mapleview and Ashwood Streets. Work will continue in this area over the next few weeks. Photo: East County AWP East County Advanced Water

Drivers should plan additional traveling time on Mapleview and Ashwood Streets in Lakeside. Work will continue in this area over the next few weeks. Photo: East County AWP

In Lakeside, temporary traffic control with reduced lanes is also in place next to El Capitan High School. Drivers should plan additional traveling time on Mapleview and Ashwood Streets. Work will continue in this area over the next few weeks. On Riverside Drive, construction recently got underway near Rio Camino and is expected to last for the next couple of months.

Purified water pipeline installation along the Channel Road Bridge is complete. Crews will soon shift work locations to State Route 67 and on the west side of the freeway on Mapleview. Pipeline installation under State Route 67 will be achieved using another trenchless construction method called ‘jack and bore.’

To stay up-to-date with project schedules, community impacts, and work descriptions, check the East County Advanced Water Purification Program’s interactive map at www.eastcountyawp.com or visit @eastcountyawp on social media.

2023 Lake Jennings Photo Contest Winners Take Shape

Helix Water District recently announced the winners of the 2023 Lake Jennings Photo Contest, with this year’s first place in the adult category going to photographer Billy Ortiz of Lakeside for his image “Reflection.”

Now in its 12th year, the contest drew 60 photos from photographers throughout San Diego County.

The East County Advanced Water Purification project is making significant progress on construction toward its 2026 opening. Photo: East County AWP

East County Advanced Water Purification Project Progressing

The East County Advanced Water Purification project is progressing, with construction underway at multiple East San Diego County locations.

The project will create a new, local, sustainable, and drought-proof water supply using state-of-the-art technology to purify East San Diego County’s recycled water. Construction for the East County AWP is expected to be completed in 2025, and water production will begin in 2026. When completed, the project is expected to provide approximately 30% of current drinking water demands for East San Diego County residents and businesses.

When completed, the water recycling facility will be able to treat 16 million gallons of water per day (MGD). The advanced water purification facility will be able to process 11.5 MGD. Photo: East County AWP

When completed, the water recycling facility can treat 16 million gallons of water per day (MGD). The advanced water purification facility will be able to process 11.5 MGD. Photo: East County AWP

Water treatment facilities are under construction north of Santee Lakes. Concrete work is underway on the water recycling and solids handling facilities. About 24,000 cubic yards of concrete have been poured, marking nearly 50% of the total concrete used at this site. Once complete, there will be enough concrete to fill 16 Olympic-sized swimming pools.

Crews at the East County AWP construction site in Santee found this friendly tarantula. More tarantulas are emerging from hiding as mating season is in full swing across San Diego County. Photo East County Advanced Water Puritifcation

Crews at the East County AWP construction site in Santee found this friendly tarantula. More tarantulas emerge from hiding as mating season is in full swing across San Diego County. Photo East County AWP

The advanced water purification facility and visitors center are also taking shape with the installation of underground piping and conduits.

When completed, the water recycling facility can treat 16 million gallons of water per day (MGD). The advanced water purification facility will be able to process 11.5 MGD.

Time lapse video of the project

Pipeline construction in Santee

Pipeline construction continues on Fanita Parkway north of Ganley in Santee. Biking and hiking access to the trails north of Ganley are temporarily located at the end of Strathmore to provide a safe space for construction.

Pipeline construction along Fanita Parkway north of Santee Lakes. Photo: East County Advanced Water Purification

Pipeline construction along Fanita Parkway north of Santee Lakes. Photo: East County AWP

The purified water pipeline will travel east through Santee and Lakeside, ending at Lake Jennings. Two additional pipelines will be constructed south of the new facilities past Carlton Oaks Drive to a pump station just south of the Carlton Oaks Golf Course.

Most pipeline work will be trenched, placed, and covered, while the remainder will be installed using trenchless technologies and methods. There may be some impacts from construction, including road travel delays. Construction hours vary depending on the project elements being completed.

The purified water pipeline running from the advanced water purification facility north of Santee Lakes to Lake Jennings is 10.2 miles long.

Interactive construction map

An interactive construction map tracks project construction sites and work progress. Photo: East County Advanced Water Purification

An interactive construction map tracks project construction sites and work progress. Photo: East County AWP

An interactive map allows viewers to zoom in and click on project areas to find active construction zones, schedules, work hours, and other information. Communication will include mailers, email updates, road signs, interactive maps, webpage updates, and presentations to community groups throughout the project area.

Groundbreaking ceremony in 2022

East County AWP-water recycling-water supply-sustainability

The East County Advanced Water Purification Program broke ground on June 1, 2022, marking an important milestone for the recycled water project in San Diego County. Photo: San Diego County Water Authority

The June 2022 groundbreaking followed the approval of project construction on May 19, 2022, by the East County AWP Joint Powers Authority that owns and operates the Program. The Joint Powers Authority is a collaborative partnership between four agencies: Padre Dam, the City of El Cajon, the County of San Diego and Helix Water District. The project is estimated to create 2,500 jobs in the region.

East County Advanced Water Purification Program

East County AWP-water recycling-sustainability-water supply-recycling

The East County Advanced Water Purification Program will create a new, local, sustainable and drought-proof drinking water supply by using state-of-the-art technology to purify East San Diego County’s recycled water to produce up to 30% of East County’s drinking water supply. Graphic: East County AWP

(Editor’s note: The Padre Dam Municipal Water District and the Helix Water District are two of the San Diego County Water Authority’s 24 member agencies that deliver water across the metropolitan San Diego region.)

Water Released From El Capitan Reservoir in Lakeside as Precaution

The City of San Diego has announced that today it has begun releasing water from El Capitan Reservoir in Lakeside, in anticipation of a potential spill due to Tropical Storm Hilary. Flowing water will be visible downstream from the dam in El Monte Valley and beyond. The notice is posted on the city’s webpage for El Capitan Reservoir.

While Southern California Battles Drought, San Diego Is Faring Better

California is no stranger to droughts, and while much of California is straining to conserve water, San Diego is in no such predicament.

A recent analysis from the New York Times found that San Diego, over the course of nearly 30 years, has become adept at conserving water and at preparing for dry years.

Helix Water District Approves Water for Sand-Mining Project

The Helix Water District board of directors has agreed to supply water over the next 20 years for a controversial sand-mining project in the El Monte Valley in Lakeside. The board will now send a letter to county planners confirming they can meet the needs of the project should it win approval.

Lindo Lake County Park to Get New Pier, Trees, Birdwatch Station, Better Water

San Diego County crews began construction Friday on a $11.2 million project intended to rejuvenate and improve Lakeside’s popular Lindo Lake County Park. Improvements at the 55-acre park will include a new fishing pier and birdwatching stations, hundreds of native trees and improved water quality in the lake’s east basin by removing more than 200,000 tons of sediment — enough to cover nearly five football fields 12 feet high — which has accrued for decades.

Opinion: Your Tap Is The Safest Source of Water During This Pandemic

As we Americans face these unprecedented times, many are rushing to the store to stock up on bottled water and other supplies. At Helix Water District, we want to remind you that your tap water is still safe and reliable.

While it’s always advisable to have a reasonable amount of emergency water on hand, the coronavirus outbreak is not a situation that will require a stockpile of bottled water. You will still have access to safe, clean water from your tap, as always.

There is no evidence that COVID-19 is transmitted through water. The illness primarily transfers from person to person through respiratory droplets produced when an infected person coughs or sneezes.

At Helix Water District, we work diligently 24 hours a day, 7 days a week to ensure your water is safe to drink, meeting all state and federal quality regulations. We collect and analyze 200 water samples a day to ensure our treatment process is effective. Our water treatment process includes disinfecting the water with ozone to chemically deactivate and physically remove viruses, bacteria and other organisms.