Huntington Beach Desalination Plant Hearings Expected to Resume in April

Hearings have been scheduled to resume in April for Poseidon Water’s controversial proposed Huntington Beach desalination plant. Last April the California Regional Water Quality Control Board, Santa Ana Region was expected to vote on renewing a permit for the proposed $1 billion project but the workshop was canceled due to COVID-19. A hearing scheduled for September was also delayed so Poseidon could have more time to address water board concerns.