Posts

To Prevent Rail Line Collapse, San Diego Area Spends $10 Million To Repair Del Mar Bluffs

The Del Mar bluffs have been plagued by a series of collapses over the last 18 months that have left residents and officials increasingly concerned about the stability of the busy railroad tracks perched atop the cliffs.

Top transportation officials are now gearing up for the largest bluff stabilization effort in nearly a decade. The San Diego Assn. of Governments and North County Transit District have already dedicated roughly $10 million to repair storm water drainage structures, replace parts of sea walls and install additional steel and concrete support columns to hold back the earth.

Storm Runoff Blames For Railroad Track Washouts On Fragile Del Mar Bluff

A second spot may need repairs after an unusually wet Thanksgiving Day storm closed the railroad tracks at Del Mar for work over the weekend, transit district officials said Monday.

The “area of concern” is less than a block away from the spot fixed Saturday, North County Transit District Executive Director Matt Tucker said Monday in an email to the district’s board of directors.

The additional job needs an engineering design plan before the work is done, and it may wait until January to be included in the next phase of the district’s ongoing bluff stabilization work, Tucker said.

Plan To Stabilize Del Mar Coastal Bluffs Moves Forward

Work to stabilize the coastal bluffs through Del Mar is moving forward, following a vote Monday by the Del Mar City Council. Council members approved an encroachment permit Monday night, allowing SANDAG to work on a 1.6 mile stretch of coastline. This is Phase 4 of SANDAG’s bluff stabilization project, which began 18-years ago. Work has already been completed along the bluffs at the end of 11th Street. The circles seen in the dirt to the west of the train tracks are actually the tops of 65-foot tall pilings that stabilize the bluffs.