South Coast Water District is set to receive an $8.3 million federal grant for the Doheny Ocean Desalination project secured during the previous round of funding, a district spokesperson said Wednesday. The grant from the U.S. Bureau of Reclamation was green lighted by Congress in 2019. SCWD is in line to receive an additional $11.7 […]
Salk Research Institute Greenhouse manager McKenna Hopwood opened a door to what she jokingly calls “the meat locker.” “Alright, here we are,” Hopwood said as she pointed to the ceiling. Bags of drying plants, both stalks and roots, hang from the ceiling, prompting the comparison to a slaughterhouse meat cooler. But, of course, the hanging […]
The San Diego County Water Authority awarded CDM Smith the planning study contract for the repair or replacement of the SDCWA pipelines in Moosa Canyon. The CWA’s Nov. 19 board vote authorized a $600,000 contract with CDM Smith for the engineering services. The planning study is expected to take approximately ten months to complete.
The U.S. Secretary of the Interior is planning to recommend a $6 million grant award for the construction of the Pure Water Oceanside project. Interior Secretary David. L. Bernhardt is planning to recommend the project for the grant award, which will come from the Bureau of Reclamation’s WaterSMART: Title XVI WIIN Water Reclamation and Reuse […]
SCWD to Receive $8.3M From Feds For Desalination Project
/in Media Coverage, San Diego County /by Chelsea Campos /Laguna Beach Independentby Daniel LanghorneSouth Coast Water District is set to receive an $8.3 million federal grant for the Doheny Ocean Desalination project secured during the previous round of funding, a district spokesperson said Wednesday. The grant from the U.S. Bureau of Reclamation was green lighted by Congress in 2019. SCWD is in line to receive an additional $11.7 […]
San Diego Researchers Looking to Grow a Climate Solution
/in Media Coverage, San Diego County /by Mike Lee /KPBS-FM/TVby Erik AndersonSalk Research Institute Greenhouse manager McKenna Hopwood opened a door to what she jokingly calls “the meat locker.” “Alright, here we are,” Hopwood said as she pointed to the ceiling. Bags of drying plants, both stalks and roots, hang from the ceiling, prompting the comparison to a slaughterhouse meat cooler. But, of course, the hanging […]
CDM Smith Given Planning Study Contract for Moosa Canyon Pipeline
/in Media Coverage, San Diego County /by Mike Lee /Fallbrook Village Newsby Joe Naiman Mentioned: San Diego County Water AuthorityThe San Diego County Water Authority awarded CDM Smith the planning study contract for the repair or replacement of the SDCWA pipelines in Moosa Canyon. The CWA’s Nov. 19 board vote authorized a $600,000 contract with CDM Smith for the engineering services. The planning study is expected to take approximately ten months to complete.
Pure Water Project May Receive $6 Million for Construction
/in Media Coverage, San Diego County /by Mike Lee /The Coast News Groupby Samantha NelsonThe U.S. Secretary of the Interior is planning to recommend a $6 million grant award for the construction of the Pure Water Oceanside project. Interior Secretary David. L. Bernhardt is planning to recommend the project for the grant award, which will come from the Bureau of Reclamation’s WaterSMART: Title XVI WIIN Water Reclamation and Reuse […]