Salk Research Institute Greenhouse manager McKenna Hopwood opened a door to what she jokingly calls “the meat locker.” “Alright, here we are,” Hopwood said as she pointed to the ceiling. Bags of drying plants, both stalks and roots, hang from the ceiling, prompting the comparison to a slaughterhouse meat cooler. But, of course, the hanging […]
The San Diego County Water Authority awarded CDM Smith the planning study contract for the repair or replacement of the SDCWA pipelines in Moosa Canyon. The CWA’s Nov. 19 board vote authorized a $600,000 contract with CDM Smith for the engineering services. The planning study is expected to take approximately ten months to complete.
The U.S. Secretary of the Interior is planning to recommend a $6 million grant award for the construction of the Pure Water Oceanside project. Interior Secretary David. L. Bernhardt is planning to recommend the project for the grant award, which will come from the Bureau of Reclamation’s WaterSMART: Title XVI WIIN Water Reclamation and Reuse […]
Southern Californians are in for a reprieve from dangerous fire weather that plagued the region for more than a week, with lower temperatures and moister air in the forecast — though still no rain.
San Diego Researchers Looking to Grow a Climate Solution
/in Media Coverage, San Diego County /by Mike Lee /KPBS-FM/TVby Erik AndersonSalk Research Institute Greenhouse manager McKenna Hopwood opened a door to what she jokingly calls “the meat locker.” “Alright, here we are,” Hopwood said as she pointed to the ceiling. Bags of drying plants, both stalks and roots, hang from the ceiling, prompting the comparison to a slaughterhouse meat cooler. But, of course, the hanging […]
CDM Smith Given Planning Study Contract for Moosa Canyon Pipeline
/in Media Coverage, San Diego County /by Mike Lee /Fallbrook Village Newsby Joe Naiman Mentioned: San Diego County Water AuthorityThe San Diego County Water Authority awarded CDM Smith the planning study contract for the repair or replacement of the SDCWA pipelines in Moosa Canyon. The CWA’s Nov. 19 board vote authorized a $600,000 contract with CDM Smith for the engineering services. The planning study is expected to take approximately ten months to complete.
Pure Water Project May Receive $6 Million for Construction
/in Media Coverage, San Diego County /by Mike Lee /The Coast News Groupby Samantha NelsonThe U.S. Secretary of the Interior is planning to recommend a $6 million grant award for the construction of the Pure Water Oceanside project. Interior Secretary David. L. Bernhardt is planning to recommend the project for the grant award, which will come from the Bureau of Reclamation’s WaterSMART: Title XVI WIIN Water Reclamation and Reuse […]
Southern California is in for a Reprieve from Dangerous Fire Weather
/in Media Coverage, San Diego County /by Mike Lee /Los Angeles Times by Hayley SmithSouthern Californians are in for a reprieve from dangerous fire weather that plagued the region for more than a week, with lower temperatures and moister air in the forecast — though still no rain.