BLOG: El Capitan’s operating schedule will change on May 1st

(Media Coverage editor’s note: This blog post previously contained erroneous information about San Diego County Water Authority operational activity at El Capitan Reservoir. The error has since been corrected by the post author.)

The city of San Diego had been drafting water from El Capitan at a rate of a little more than 1 foot per week since March 5th, leaving the lake lower than it had been in over a decade. However, the drafting stopped on April 7th, and the water level has leveled off about 5 vertical feet higher than the minimum operating level for the launch ramp to be usable.