You are now in Home Headline Media Coverage San Diego County category.

Salton Sea Wetland Projects Access Agreement Afoot

With the clock ticking, a major hurdle to restoring the southern edge of the fast-drying Salton Sea may finally be overcome. Imperial Irrigation District general manager Henry Martinez told the Desert Sun that he and California Natural Resources Secretary Wade  Crowfoot have reached an agreement in principle that the state — not the water district — will be responsible for construction and maintenance of more than 3,700 acres of wetlands aimed at controlling toxic dust and restoring wildlife habitat. In exchange, the water district will sign easements for access onto lands it owns that border California’s largest lake. The agreement could break a years-long impasse and find ways to get restoration projects moving.

Study Estimates 15,000 Cancer Cases Could Stem From Chemicals In California Tap Water

A new study finds that drinking tap water in California over the course of a lifetime could increase the risk of cancer. Researchers from the environmental advocacy group Environmental Working Group estimated that the contaminants found in public water systems in California could contribute to about 15,500 cancer cases there over the course of a lifetime. These contaminants include chemicals such as arsenic, hexavalent chromium and radioactive elements such as uranium and radium. The study was published Tuesday in the journal Environmental Health.

Yuba Water Agency, DWR Launch Research To Enhance Reservoir Operations

Yuba Water Agency launched an initiative with the California Department of Water Resources (DWR) and University of California San Diego’s Scripps Institution of Oceanography to improve storm and runoff forecasting, and significantly reduce flood risk though enhanced operations of New Bullards Bar and Oroville dams. This research will supply information needed for the U.S. Army Corps of Engineers to update the 1970’s-era water control manuals, which dictate the storm-season operations of both reservoirs. Yuba Water’s goal is to have a new water control manual approved about the same time the agency completes construction of a new, planned secondary spillway at its New Bullards Bar Dam, estimated for completion in 2024.